When it comes to heavy lifting in construction, crawler cranes and tower cranes are two of the most commonly used machines. But choosing between them depends on project type, lifting capacity, mobility, and site conditions.
In this guide, we compare crawler cranes vs tower cranes in terms of lifting capacity, setup, mobility, cost, and best use cases—helping you decide which crane is best for your next project.
| Feature | Crawler Crane | Tower Crane |
| Mobility | Moves on tracks (crawlers), suitable for rough terrain | Fixed or climbing requires assembly on-site |
| Setup Time | Quick setup (hours), no tall mast needed | Long setup (days/weeks), requires foundation & mast assembly |
| Lifting Capacity | Up to 1,500+ tons (heavy lifting) | Up to 20-30 tons (high but limited compared to crawlers) |
| Working Radius | Wide reach (50-100m+) with long booms & jibs | Vertical reach (200m+), but limited horizontal movement |
| Best For | Heavy lifts, remote sites, short-term projects | High-rise buildings, long-term urban construction |
| Cost | Higher rental/purchase cost, but flexible | Lower per-use cost (if long-term), but expensive setup |
| Transport | Easier to move (on trucks or self-propelled) | Requires disassembly & crane-assisted erection |
Bridge & dam construction
Heavy industrial equipment lifting
Power plant & refinery projects
Short-term or mobile lifting needs
Liebherr LR 13000, Kobelco SK1500, Hitachi KH150, Terex Demag CC 8800

Advantages
Extreme Height Reach – Can lift materials 200m+ (600+ ft) vertically (perfect for skyscrapers).
Efficient for High-Rise Projects–Fixed position allows continuous lifting over long periods.
Lower Long-Term Cost– Cheaper per use if installed for months/years.
Precise Horizontal Movement–Trolley & slewing allow accurate material placement.
Slow & Complex Setup – Requires foundation, mast assembly, and climbing system (takes days/weeks).
Limited Mobility – Fixed in place, needs a climbing mechanism to go higher.
Lower Lifting Capacity – Max 20-30 ton (not for ultra-heavy lifts).
High-rise building construction
Urban construction (limited space)
Long-term projects (months/years)
Precise material placement (windows, steel beams)
Popular Tower Cranes
Liebherr 345 EC-B, Potain MDT 239, Terex Comedil CTT 330
Choose a Crawler Crane If:
You need heavy lifting (100+ tons).
The job site has rough terrain or limited access.
The project is short-term or requires mobility.
You need a wide reach (50-100m+).
Choose a Tower Crane If:
You’re building a high-rise (skyscraper).
The project is long-term (months/years).
You need precise vertical & horizontal material placement.
Space is limited (urban construction).

| Project Type | Best Crane |
| Bridge, Power Plant, Heavy Industry | Crawler Crane |
| Skyscraper, Urban High-Rise | Tower Crane |
| Short-Term, Mobile Lifting | Crawler Crane |
| Long-Term, Vertical Construction | Tower Crane |