Last week, VM® completed the delivery of 84 tons of Manitowoc 4100 track shoes. Before delivery, the technicians conducted a detailed inspection of each track shoe.
Ultra-high load-bearing design
Specially customized for Manitowoc 4100 series cranes, it is cast with high-quality steel from Baosteel. It has been heat-treated to enhance wear resistance and pressure resistance, making it suitable for extreme working conditions such as mines and large-scale infrastructure.
Precise engineering adaptation
Strictly following the original OEM specifications to ensure seamless matching with the Manitowoc 4100 chassis system, effectively reducing abnormal equipment wear and extending the service life of the whole machine.
Shorten downtime
The customer’s equipment downtime caused by crawler wear is reduced by more than 40%, ensuring the progress of key construction nodes.
Full life cycle cost optimization
High-durability accessories reduce frequent replacement costs, and comprehensive maintenance costs are expected to drop by 25%.
Supply chain capability breakthrough
This delivery took only 16 days, highlighting the core advantages of the company’s agile supply chain system for heavy engineering parts:
✅ Technical response mechanism: 24-hour online support from the engineering team
✅ Large-tonnage logistics solutions: Professional heavy equipment transportation partner guarantee